Air Products Baytown 3 Hydrogen SMR Facility — Texas
Overview
TYPE3’s map data identifies Air Products Baytown Hydrogen (SMR) Facility as Operating, with Air Products as operator and a 50 MW estimated power field. TCEQ identifies the Baytown 3 Facility at 7714 West Bay Road, Baytown, Chambers County, and describes a permit renewal authorizing continued operation. The process separates and purifies hydrogen and carbon monoxide.
Air Products’ project announcement describes a 70 million standard-cubic-foot-per-day hydrogen SMR connected to the West Gulf Coast hydrogen pipeline system. TCEQ air-emission records identify Baytown 3 as a reporting facility. TYPE3’s Harris County label should be reconciled with the TCEQ Chambers County address record; the exact street address and Baytown 3 identity are stronger evidence.
Hydrogen throughput, pipeline connectivity, emissions limits, and electrical demand are separate. Do not infer the 50 MW estimate from SMR size or production. Request current interval demand, peak load, utility account, backup generation, and operating schedule before publishing an energy-use claim.
The county discrepancy is an inventory-quality issue, not evidence of two plants: Baytown 3, 7714 West Bay Road, and the TCEQ regulated entity are the stronger identity anchors reviewed here. Air Products’ older announcement establishes the designed hydrogen throughput, while the newer TCEQ renewal establishes continued operation; neither supplies the site’s current MW demand.
Questions
What is Air Products Baytown 3?
It is Air Products’ Baytown 3 industrial-gas facility at 7714 West Bay Road, producing hydrogen and carbon monoxide through SMR-related processes.
How much power does it use?
TYPE3’s 50 MW is unconfirmed. The 70 MMSCFD figure describes hydrogen throughput, not electrical demand.
Is Baytown 3 operating?
Yes. TCEQ’s renewal summary describes continued operation. Reconcile TYPE3’s map data county with TCEQ’s Chambers County record.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.