Amazon AWS Bitter Blue Campus — San Antonio
Overview
The Bitter Blue campus covers Amazon Data Services work at 12807 Donop Road in San Antonio, Bexar County. TYPE3’s map data labels it an Amazon AWS hyperscale data center, provides site-level coordinates, and marks it announced with zero MW. Current TDLR records give the campus a clearer structure: Building B is a new 119,407-square-foot, two-story single-tenant computer data center with an estimated $65 million cost and a submitted completion date in February 2029. A separate Building A filing covers an interior alteration to add liquid cooling, with a submitted June 2027 completion date.
The same address appears in earlier Amazon-associated filings for the Rockfish/Bitter Blue Romp 03 and 04 fit-out and ALE061 Room 2. Data Center Dynamics connects the Donop Road filings to AWS while distinguishing them from the less certain tenant attribution at the Potranco location. The earlier filings belong in the campus history, but they do not turn the address into one building or one capacity number.
A construction filing, a cooling retrofit, and live compute load describe different things. TDLR square footage and estimated cost do not establish critical IT load, energized capacity, utilization, or curtailment capability. Building A, Building B, and the earlier Rockfish/ALE061 work are distinct projects within the Bitter Blue campus and must not be combined into one building or MW figure.
Questions
What is the Amazon Bitter Blue campus?
It is a multi-building Amazon data-center site at 12807 Donop Road in San Antonio, including new construction and a liquid-cooling alteration.
How many megawatts does Bitter Blue have?
The cited TDLR records disclose no IT load or operating MW. Square footage and project cost should not be converted into a MW estimate.
Is Bitter Blue operating?
The records support planned construction and facility upgrades, not a verified operating status for the campus as a whole.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.