American Tower EDC San Antonio — Highway 90
Overview
TYPE3’s map data names American Tower EDC San Antonio at 5436 W US Hwy 90 in San Antonio. A DataCenterMap profile reports a new edge facility on a vacant lot next to an existing cellular communications site, with a stated $15 million investment and approximately 7,255 square feet. It describes the project as separate from, but related to, the cellular operation. Interconnection.fyi lists the address as 5436 New Highway 90 West, identifies American Towers, LP as operator and owner, and records a 2023 application and approval, but its project status remains Construction while its timeline includes a 2024 actual operational date.
American Tower’s own edge-data-center brochure supports the service model: professionally managed sites with primary and secondary critical power, power distribution, HVAC, security, monitoring, and managed connectivity. The brochure is portfolio-level and does not confirm the San Antonio site’s energization, customer inventory, utility service, or MW allocation. TYPE3’s Announced/0 MW values therefore remain the safe inventory representation.
The facility fits edge colocation, low-latency connectivity, and tower-adjacent infrastructure searches without evidence of a large campus. The facility name and address variant, construction completion, operating status, site power, and available cabinets remain unresolved. The record is distinct from CoreSite metro facilities and nearby San Antonio hyperscale campuses.
Questions
What is American Tower EDC San Antonio?
It is a reported tower-adjacent edge data-center project at Highway 90 in San Antonio. American Tower’s portfolio materials describe managed, low-latency edge infrastructure that connects local sites to wider network and cloud resources.
How much power does it use or offer?
TYPE3’s map data records 0 MW, and no reviewed site-specific source publishes a current power figure. American Tower’s brochure describes primary and secondary critical power as a design feature, not a San Antonio capacity disclosure.
Is American Tower EDC San Antonio operating?
The evidence conflicts. Interconnection.fyi labels the project Construction but includes a 2024 actual operational date, while DataCenterMap describes a development. Confirm completion, energization, and customer availability with American Tower.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.