DataBank HOU3 — Westway Park III
Overview
DataBank’s current facility page identifies HOU3 as Westway Park III at 11003 Corporate Centre Drive, Houston, Texas 77041. The building is part of Westway Park Campus but has its own address and facility profile, separate from HOU1 at 5150 Westway Park Boulevard and HOU2 at 5170 Westway Park Boulevard. DataBank lists 41,860 IT square feet, 6.5 MW of critical IT load, 39 onsite carriers, N+1 power, N+2 cooling, cabinets and cages, and HPC compatibility.
The facility page also describes HOU3 as being along a major fiber corridor with scalable, redundant power feeds, direct cloud connectivity, managed internet connectivity, and metro data-center interconnect. A 2026 DataBank announcement reports a planned 3,150 kW rooftop solar array at HOU3. That solar project is sustainability and generation context; it is not IT capacity, current load, or customer availability.
HOU3 can use verified current-operator language because DataBank maintains an address-specific page and Houston campus listing. The page does not establish measured operating draw, utility service limit, or customer-available power. The 6.5 MW label remains explicitly “critical IT load.” The rooftop-solar announcement remains separate from the facility’s electrical service and from HOU1/HOU2 metrics. HOU3 is the Westway Park III address-level facility, with separate metrics and a distinct solar project from its siblings.
Questions
Where is DataBank HOU3?
DataBank HOU3, also called Westway Park III, is at 11003 Corporate Centre Drive in Houston, Texas 77041.
Is HOU3 the same building as HOU1 or HOU2?
No. All three share Westway Park Campus, but HOU3 has its own address and separate facility metrics.
Does HOU3 have 6.5 MW available?
Not necessarily. DataBank labels 6.5 MW as critical IT load. Current load and customer-available power are not published in the cited sources.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.