Duos Edge AI Amarillo Data Center
Overview
TYPE3’s map data lists Duos Edge AI - Amarillo as an announced retail/network-colocation facility at 810–814 S Tyler Street, with Duos Edge AI, Inc. as operator and `0 MW`. Local Potter County minutes record a request for a lease for a Duos AI data center on county-owned property at 810 S Tyler. This establishes the proposed site context but does not by itself establish energization or customer operations.
Duos’s 19 March 2026 investor-relations release provides stronger deployment evidence. It says Duos deployed its second EDC in the Amarillo market on Potter County land, positioned adjacent to the Texas Panhandle’s largest colocation facility. Duos described the installation as carrier-neutral and SOC 2-compliant, intended to provide high-density, low-latency computing for AI applications, bandwidth, and secure data processing. The same release said the facility was expected to be fully operational in the coming months, which is a forward-looking commissioning statement rather than proof of current online service.
DCD independently reported the 810–814 S Tyler street location and described the module as expected to become operational in the coming months. The exact listed address remains, with status described as deployed or commissioning based on the dated sources. The 300 kW per-container and 100 kW-plus-per-cabinet platform language is not assigned to the Amarillo site. This record remains distinct from Duos’s first Amarillo EDC at 5800 Bell Street and from the Hereford deployment.
Questions
What is Duos Edge AI - Amarillo?
It is Duos Edge AI’s second Amarillo-market modular Edge Data Center, associated with 810–814 S Tyler Street on Potter County land. The project is intended to provide localized, low-latency computing and connectivity.
How much power will the Amarillo Duos EDC use?
No site-specific MW figure is published. Duos platform materials describe general cabinet or pod capabilities, but those figures are not evidence of this site’s utility service or operating IT load.
Is the 810–814 S Tyler facility operating?
Duos announced deployment in March 2026 and said full operation was expected in the coming months. Publish it as deployed or commissioning unless a later operator notice confirms commercial operation.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.