TYPE3’s map data identifies Freeport LNG Terminal as an LNG export facility in Brazoria County, with coordinates 28.9660, -95.3020, city precision, Operating status, a 2019 field, and a 150 MW seed estimate. Its note describes a major Quintana Island terminal with approximately 13.4 MTPA of nameplate export capacity across three trains and warns that the power figure is unconfirmed. The process-capacity and electrical-load layers remain separate.
Freeport LNG’s board and company materials identify three natural-gas liquefaction trains and state that full commercial LNG export operations began in May 2020. The same source says total export capacity is 15 MTPA and that 13.4 MTPA has been sold to named counterparties. Those are commercial and production measures, not a current site load or a vacancy schedule. The reviewed sources support an operating identity but do not publish a current electrical demand profile, interruptible quantity, or customer-available power.
Freeport LNG is a distinct operating terminal on Quintana Island, separate from Golden Pass and Rio Grande LNG. TYPE3’s 150 MW estimate remains unverified; nameplate MTPA cannot be divided into MW, and three trains alone do not establish demand-response suitability. A flexibility program would require direct operator and utility assessment of live process load, backup generation, outage constraints, and operating restrictions.
Questions
Is Freeport LNG operating?
Yes. Freeport LNG says its three-train export facility began full commercial LNG export operations in May 2020.
How much LNG can Freeport LNG export?
Freeport LNG publishes 15 MTPA of export capacity across three trains. That is LNG production scope, not electrical demand.
Is TYPE3’s 150 MW figure verified?
No. TYPE3’s map data labels it an unconfirmed estimate for electrical/compression load; current site demand and available flexibility are not established.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.