MDC ELP1 El Paso Data Center
Overview
TYPE3’s map data lists MDC El Paso - ELP1 as an announced retail/network-colocation facility operated by MDC Data Centers at 11455 Cedar Oak Drive, with `0 MW`. MDC’s official English ELP1 page verifies the address and positions the site as a growing border interconnection hub. It describes a carrier-neutral facility connected to International Fiber Crossings and hosting MEX-IX, with a communications tower and a network ecosystem that includes Lumen, Arelion, Cogent, Zayo, FiberLight, Sparkle, and others.
The same English page publishes electrical layers: 500 kVA electrical capacity, 480-volt utility, 500 KVA emergency power, 20-minute battery backup, N+1 CRAC cooling, FM200/CO2 suppression, and 48 hours of generator autonomy with a full tank. The Spanish ELP1 page presents a different set of generator and autonomy details, including a 500 kW diesel generator and 90 hours. Because both are MDC pages and the figures are not aligned, the source ledger preserves the conflict instead of selecting a value silently.
A City of El Paso license record documents McAllen Data Center’s acquisition condition and fiber use at the address, adding historical evidence for the operator’s El Paso presence. The supported positioning is network and border-market relevance, not a wholesale campus. Utility capacity, emergency generation, battery duration, and cooling redundancy remain separate key facts. The listed zero is an unreported IT-load field, not evidence of zero consumption, and neither official page provides a customer-specific curtailment or measured operating-load program.
Questions
What is MDC ELP1?
MDC ELP1 is MDC Data Centers’ carrier-neutral El Paso facility at 11455 Cedar Oak Drive. MDC describes it as a border interconnection hub connected to International Fiber Crossings and MEX-IX.
How much power does MDC ELP1 use?
MDC publishes 500 kVA electrical capacity on its English page, plus separate emergency-power and backup details. That is infrastructure capacity, not current IT load or available flexible load.
Is MDC ELP1 operating?
MDC currently markets ELP1 and lists its carrier ecosystem, supporting a reported active facility presence. Exact operating load and some generator/autonomy details remain unverified or internally conflicting.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.