Skybox Atlantic Station DC2 — Plano, Texas
Overview
TYPE3’s map data lists Skybox Atlantic Station DC2 in Plano with Skybox Datacenters as operator, Announced status, and 0 MW. Live coordinates are 33.00665, -96.73853, slightly offset from DC5 at site precision. That offset is a mapping hint, not a published building footprint. The note repeats the parent campus paste used on other Atlantic Station children.
Skybox’s campus page supports build-to-suit delivery in 12–24 months, densities from 250 to 1,000 W/psf, and immersion or liquid-to-chip cooling as campus options. Those are campus design menus, not DC2 as-built ratings. The brochure’s 25 MW current site availability and dual 25 MVA transformers remain site-level electrical context. Prologis’s “up to four” halls conflicts with DataCenterMap’s five named children (DC1–DC5); keep the hall-count conflict labeled rather than forcing a number onto DC2.
Do not treat DC2 as interchangeable with DC1 or DC3 from SEO-032, or with DC4/DC5 in this batch. Skybox has not identified which hall, if any, is DC2, whether it is a powered shell or a fitted hall, or what critical-IT block is energized or quoteable. Preserve Announced / 0 MW. Keep Atlantic Station off Legacy at 6800 Communications Parkway and off PowerCampus Dallas in Lancaster. No child MW is invented.
Questions
Is Atlantic Station DC2 the same building as DC5?
No. TYPE3’s map data stores separate child rows with slightly different site coordinates. Neither row has a first-party hall map.
Can Type 3 publish 25 MW on DC2?
No. 25 MW / 25 MVA is brochure site-availability and transformer context for the campus, not a DC2 IT block.
How many halls are planned?
Prologis says up to four mission-critical halls; DataCenterMap names five children. Leave that conflict visible.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.