Stream San Antonio III Campus — San Antonio, Texas
Overview
TYPE3’s map data identifies Stream DC San Antonio III Campus as a Stream Data Centers wholesale/build-to-suit campus in San Antonio, with Announced status and 0 MW. Stream’s current San Antonio III page identifies the SATB campus at 11203 Military Drive W. It describes 1.5 million square feet at full build, 200 MW at full build, and a $400 million investment. The first SATB1 facility is described as 300,000 square feet, with a 334 MW CPS substation and a first facility that is fully leased.
Stream also describes a dual-fed breaker-and-a-half CPS substation, 2N distribution to each building, and air/liquid cooling with zero water use. These are infrastructure and design attributes, not proof of current IT load or uncommitted capacity. The 334 MW substation number must not be represented as 334 MW of IT capacity, and the 200 MW campus figure must not be repeated as available capacity for every building.
Keep San Antonio III distinct from Stream San Antonio II/SATA1 at 9550 Westover Hills Boulevard, although the locations are nearby. TYPE3’s Announced/0 MW values remain untouched. The operator’s fully leased statement is relevant to commercial scope, but it does not establish total energized load or future vacancy. Before a page claims availability, request the specific building, utility delivery, critical-IT schedule, customer/lease status, backup layer, and remaining capacity.
Questions
What is Stream San Antonio III?
It is Stream Data Centers’ SATB campus at 11203 Military Drive W in San Antonio. It is separate from Stream San Antonio II/SATA1 at 9550 Westover Hills Boulevard and should have its own construction and capacity record.
How much power will Stream San Antonio III have?
Stream reports 200 MW at full campus build and a separate 334 MW CPS substation. The latter is utility infrastructure, not IT capacity. Neither figure establishes current available customer power or should be assigned to every child building.
Is Stream San Antonio III operating?
Stream lists SATB as Under Construction and says the first facility is fully leased. Those facts do not establish campus-wide energization or current vacant capacity. TYPE3’s map data remains Announced and 0 MW.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.