Vantage TX11/TX12 — San Antonio, Texas
Overview
TYPE3’s map data lists Vantage TX11/TX12, San Antonio, as a construction-stage wholesale/build-to-suit record. Its notes identify TX11 at 32 MW as operating on Omicron Drive and adjacent TX12 at 96 MW as a $276.8 million, 432,800-square-foot project under construction from October 2025 through August 2027. The row’s 96 MW field therefore aligns with the TX12 development layer, not a combined currently operating allocation.
The Texas Comptroller’s current data-center list provides regulatory/tax-record context for both “TX11 Data Center” and “TX11-12 Data Center,” naming Vantage entities and related owners/operators. That evidence supports the separate legal/project lineage but does not verify energized IT load, commercial availability, or final completion. TYPE3’s coordinates are a regional San Antonio point, not a substitute for a building address.
Editorially, use distinct subheadings or callouts for TX11 operating and TX12 construction. Do not add 32 MW and 96 MW, do not call TX12 operating before completion evidence, and do not translate tax-exemption or project records into available customer capacity. Request Vantage’s current site address, critical-IT allocation, utility service, generator/UPS design, construction milestone, and customer-ready date. Delivery timing remains subject to confirmation, and customer commitments should be verified separately. Final commissioning evidence is still absent. Its customer release date also remains unverified.
Questions
What is the difference between Vantage TX11 and TX12?
TX11 is the operating facility described in TYPE3’s map data at 32 MW. TX12 is an adjacent 96 MW project under construction with a 2027 timing field. They should be treated as related but distinct project/building layers.
Is Vantage TX12 operating?
No operating status is verified for TX12. TYPE3’s map data marks the combined row Construction and gives 2027 as the operational field. Tax or project records support the development identity but do not prove energization or customer launch.
Can the 32 MW and 96 MW figures be sold as available capacity?
No. They are source-labeled operating/design figures for different project layers. Current load, contracted capacity, utility service, and vacant customer allocation must be confirmed directly with Vantage.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.