904 Francis Harris Lane — San Marcos Proposal
Overview
The listing describes 904 Francis Harris Lane as announced retail colocation in San Marcos at 0 MW, operator Unknown Company, with a 200-acre note next to Hays Energy. City and press records name the applicant. San Marcos’s development-projects page describes a nearly 200-acre Francis Harris Lane Data Center, land inside and outside city limits, a Preferred Scenario amendment from Conservation/Cluster to Commercial/Employment Low, rezoning from CD-2.5 / FD to Light Industrial, and annexation of about 64 acres. Landowners in earlier DCD coverage were Highlander SM One LLC and, separately, Donald and Germaine Tuff. Counsel Armbrust & Brown appeared for the applicant.
Capacity language is planned, not measured. January 2026 Statesman coverage of a Planning and Zoning recommendation described five buildings at about 76 MW each and a closed-loop fill of 60,000–70,000 gallons. That 76 MW figure is a proposed building power rating. It is not operating IT load and not an interconnection award the cited evidence can certify. The 18 February 2026 Statesman report said council then denied the preferred-scenario map 5–2. Status is a denied or stalled entitlement path, not construction. This proposal remains distinct from other Francis Harris Lane data-center proposals. The listing’s 0 MW baseline is empty, not a load study.
Questions
Is 904 Francis Harris Lane operating?
No. It is a proposed San Marcos campus. February 2026 coverage reported council denial of the preferred-scenario map.
Who is the operator?
The listing identifies Unknown Company. Filings and coverage name Highlander SM One LLC as applicant, not a hyperscale tenant.
Are 76 MW or 380 MW operating figures?
No. Seventy-six MW per building is a planned rating in press, not operating IT load.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.