SDC San Marcos — Sabey Data Center Proposal
Overview
TYPE3’s map data lists SDC San Marcos under Sabey Data Center Properties LLC in San Marcos, with `Announced` status and 0 MW. Public reporting from 2025 describes Sabey seeking a development agreement for approximately 786 acres southwest of South Old Bastrop Highway and Centerpoint Road. The proposal included a mix of conservation, housing, and data-center development, with roughly 184 acres identified for light-industrial use and a Pedernales Electric Cooperative substation in the concept. Entering negotiations was not final approval.
San Marcos city materials also describe a separate Francis Harris Lane / Maberry data-center proposal and note that a separate Sabey site was under development-agreement review. Those nearby projects should not be merged: the city records use different applicants, tracts, and approval processes. The SDC San Marcos row has no supported building square footage, MW allocation, construction milestone, or customer evidence in the reviewed sources.
SDC San Marcos serves a high-intent Sabey/San Marcos query as an early-stage record. The 786-acre figure is proposed site context, not data-center building area. Its development agreement, parcel boundaries, land-use approvals, substation scope, water plan, and any current construction or tenant evidence still require confirmation before TYPE3’s map data baseline changes or commercial availability is described in the reviewed sources to date.
Questions
What is SDC San Marcos?
It is a proposed Sabey data-center campus near South Old Bastrop Highway and Centerpoint Road in San Marcos. Public reporting describes a larger mixed-use tract with a proposed light-industrial data-center area, not a completed facility.
How large is the SDC San Marcos site?
The proposal is associated with approximately 786 acres. That is a broader land and development-agreement figure, not verified data-center building area or IT capacity.
Is SDC San Marcos operating?
No. The reviewed sources describe an early development and negotiation process without a verified building, energized load, tenant, or current availability.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.