Aligned DFW-03 — Mansfield, Texas
Overview
TYPE3’s map data identifies Aligned DFW-03 as a wholesale/build-to-suit data-center project in Mansfield, Tarrant County, with Aligned Data Centers as operator, Announced status, and 0 MW. The row’s source is a generic DataCenterMap Texas page, so the exact facility identity was rechecked against Aligned’s first-party sources.
Aligned’s locations page identifies DFW-03 at 3801 Britton Road, Mansfield, Texas 76063, and describes a 27-acre campus designed to Tier III standards with 24x7x365 accessibility and a 100% uptime SLA. Aligned’s February 2025 announcement states that DFW-03 is on a 27-acre site with an onsite substation and that initial capacity was anticipated as early as Q4 2025. The announcement also describes the company’s broader future-capacity portfolio and high-density cooling capabilities. Those portfolio and design statements do not establish DFW-03’s current energized IT load or remaining customer capacity.
Use this page for Aligned DFW-03 and Mansfield build-to-scale discovery. Keep it separate from Aligned DFW-01/DFW-02 in Plano and DFW-04, whose 44-acre address is also in Plano. Do not inherit DFW-02’s 36 MW, DFW-04 construction, or Aligned’s 5,000-plus MW future portfolio into DFW-03. Request the current building, commissioning, utility, critical-IT, and leasing state before quoting power. No tenant assignment or live load is established. Current status remains unverified.
Questions
Where is Aligned DFW-03?
Aligned DFW-03 is at 3801 Britton Road in Mansfield, Texas. Aligned identifies it as a 27-acre DFW campus designed for Tier III standards, distinct from its Plano DFW-01, DFW-02, and DFW-04 facilities.
How much power does DFW-03 have?
TYPE3’s map data records 0 MW, and the reviewed Aligned pages do not publish a current DFW-03 IT-load or available-MW figure. An onsite substation and portfolio-level capacity language do not establish customer-ready power.
Is DFW-03 operating?
Operating status is not independently verified here. Aligned’s 2025 announcement targeted initial capacity as early as Q4 2025, while TYPE3’s map data remains Announced. Confirm construction, commissioning, energization, and leasing status directly.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.