Blueprint Taylor Data Center — Taylor, Texas
Overview
TYPE3’s map data lists Blueprint Taylor DC in Taylor, operated by Blueprint Data Centers, with `Announced` status and 0 MW. The City of Taylor’s project page identifies the proposed facility on the southeast side of town, inside Carlos G. Parker Boulevard between Martin Luther King Boulevard and the railroad tracks. The city describes a 135,000-square-foot data center, three development phases, three buildings, an electricity substation, backup generators, and a closed-loop cooling system. It also describes a total investment plan of $1 billion.
The city’s broader data-center page says Taylor currently has two projects in various stages and identifies Blueprint as a proposed campus whose Employment Center Plan was approved in July 2025. These municipal records establish project identity, land-use process, and planned infrastructure. They do not establish that the buildings are energized, that any tenant has taken service, or that a published MW figure can be assigned to TYPE3’s map data row. TYPE3’s 52-acre note is retained as inventory context, but the current municipal project page does not use that acreage in its core overview.
Blueprint Taylor DC remains a proposed project with development-stage evidence, not a commissioned facility or current capacity listing. Confirm the final site acreage, building permits, phase schedule, utility delivery, customer allocation, construction milestone, and current orderable critical-IT capacity before changing Announced/0 MW. Keep substation and generator infrastructure separate from IT load.
Questions
What is Blueprint Taylor DC?
It is Blueprint’s proposed Taylor data-center project in Williamson County. Taylor describes a 135,000-square-foot, three-phase project with three buildings and supporting power and cooling infrastructure.
How much power will Blueprint Taylor use?
The reviewed municipal sources do not publish a reliable project MW figure. The planned substation and backup generators are infrastructure layers, not proof of current or future IT load.
Is Blueprint Taylor operating?
No operating state is verified. Taylor describes it as a proposed project with an approved Employment Center Plan, while TYPE3’s map data remains Announced with 0 MW.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.