TYPE3’s map data lists Skybox PowerCampus Austin in Hutto, operated by Skybox Datacenters, with `Announced` status and 0 MW. It is the parent row for DC1 through DC6 in this batch. Skybox’s current PowerCampus Austin page describes a 600 MW campus on 160 acres, with up to 4 million square feet of data-center space, N/N+1/N+2C configurations, and an on-site privately owned substation. It says the site is in Oncor’s deregulated power territory and offers build-to-suit options.
Skybox’s Austin market page presents a different summary: 1,280,000 square feet and up to 400 MW of critical load for PowerCampus Austin. The official brochure presents 3,880,000 square feet, 600 MW design criteria, a 224-acre site line in its facility overview, and a six-building table totaling 576 MW of total load and 384 MW of critical load. These figures may represent different dates, site boundaries, configurations, or marketing layers. Preserve the distinctions rather than collapsing them into one “capacity” number.
The parent page should explain that a large power and space plan is commercially relevant but does not equal commissioned IT. Keep DC1–DC6 as linked children, with their source-specific design figures separate. Confirm the current site boundary, permits, building phases, energized service, tenant allocations, and orderable critical-IT capacity before changing TYPE3’s Announced/0 MW state.
Questions
Where is Skybox PowerCampus Austin?
TYPE3’s map data and operator materials place it in Hutto, Texas, in the North Austin market. The operator describes a large campus with private substations and access to Oncor’s deregulated territory.
Is Skybox PowerCampus Austin a 600 MW facility?
Skybox’s current project page reports up to 600 MW, but other operator materials describe different site and critical-load summaries. Treat 600 MW as a parent design/availability statement, not current operating IT load.
Can the parent’s capacity be added from DC1–DC6?
No. The parent and child records are linked but unmerged. Child brochure configurations and parent summaries must remain separately labeled and reconciled before any aggregation.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.