Cisco Richardson Data Center — Private TXDC1
Overview
TYPE3’s map data lists Cisco Richardson Data Center as announced retail colocation in Richardson at 0 MW, with site coordinates and a DataCenterMap seed that only says “see the profile.” That category is wrong. Data Center Knowledge’s 27 October 2009 tour placed Cisco’s flagship Texas data center in Richardson: an $80 million conversion of an unused four-story, 285,000-square-foot office building, using the first two floors, four data halls totaling 30,000 square feet, two 10-megawatt power feeds, six 2.5 MW diesel generators with four 1,200-gallon tanks, and a 25,000-gallon thermal storage tank. Network World’s 8 November 2010 report on “Texas DC1” described a 5-megawatt facility with 28,000 square feet of raised floor. Those are dated design and utility layers, not 2026 operating IT load and not a colo product.
The identities remain separate. Cisco’s CCIE / training lab is associated with Building 5 at 2250 East President George Bush Highway, not this hall. Cisco Allen, opened in 2011 as an active-active mirror about 15 miles north, is already a distinct Cisco record and remains private enterprise infrastructure. Baxtel still lists Cisco Richardson TXDC1 / RCDN9 at 2300 E PGB Highway as operational; that aggregator label does not create a public colo offer. The 10 MW feeds, 2.5 MW generators, and the 2010 5 MW rating are not current available load.
Questions
Is Cisco Richardson a colocation site?
No current Cisco colo offer was found. Historical coverage describes a private Texas DC1 / TXDC1 on the Richardson campus.
How much power does it use?
2009 sources list two 10 MW utility feeds and six 2.5 MW generators. 2010 coverage used a 5 MW facility rating. None of those is a 2026 operating IT-load figure.
Is this the same as Cisco Allen?
No. Allen opened in 2011 as a separate private hall. The pages remain unmerged.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.