CyrusOne DFW20A — Fairfield, Texas
Overview
TYPE3’s map data lists CyrusOne DFW20A - Fairfield in Fairfield, operated by CyrusOne Data Centers, with `Announced` status and 0 MW. It is the first named child in the DFW20 Fairfield/Freestone campus. TDLR project TABS2026026013 identifies DFW20A at 1356 FM 488 in Fairfield, Freestone County. The filing describes a one-story insulated-precast building with accessory support spaces totaling 306,216 square feet, a March 2, 2026 start date, a March 23, 2027 projected completion date, and a $500 million estimated cost.
The TDLR record is marked `Project Registered` and has no assigned tenant. A second TDLR registration, TABS2026026904, describes a DFW20A fit-out at the same address and square footage with an August 23, 2026–August 23, 2027 schedule and a $100 million estimate. Treat the second record as a related scope, not additive building area or proof that the project is operating.
Together, the records establish a substantial planned building scope while leaving energization and commercial readiness unresolved.
CyrusOne and Constellation/Calpine announced a 380 MW agreement to connect and serve the new facility adjacent to the Freestone Energy Center, with an additional 380 MW Phase 2 agreement. These are campus power-supply and development layers. TYPE3’s 0 MW is retained, and no public source reviewed assigns a DFW20A-only IT load, tenant, commissioning state, or current saleable inventory.
Questions
What is DFW20A?
It is the first named child of CyrusOne’s planned Fairfield/Freestone campus, with a TDLR registration at 1356 FM 488.
Is the 380 MW agreement DFW20A capacity?
No. It is a parent-campus power-supply agreement. The reviewed sources do not publish a DFW20A-only IT or availability figure.
Is DFW20A complete?
Completion is not verified. TDLR lists a registered project and projected dates; it does not establish energization, commissioning, or tenant service.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.