EG AI Rice Texas Data Center
Overview
EG AI Rice is a planned private-AI infrastructure project, not a conventional retail colocation listing. EG AI’s current website describes a purpose-built Dallas facility with immersion-cooled GPU racks and 2.5 MW of planned capacity. The company positions the project for private, single-tenant workloads, including regulated enterprise use cases, rather than shared cabinets sold to a broad colocation market.
The location requires careful wording. EG AI markets the facility as Dallas, while a community presentation and current industry reporting associate the development with Rice, a city in Navarro County south of Dallas. That supports TYPE3’s Rice label as a reported location, but the company’s public page does not provide a street address or an independently verified municipal status. Use “Rice-area” or “Rice, Texas, reported” until a permit, project filing, or company location page ties the facility to a precise parcel.
The 2.5 MW figure is described by EG AI as planned compute capacity. It must not be rewritten as measured IT load, utility service, energized capacity, or customer availability. Industry reporting says groundbreaking was announced and completion was slated for 2027, but the public record still does not establish commissioning or commercial operation. The facility’s immersion-cooling claims are relevant to the AI-compute story, yet they do not resolve grid interconnection, power procurement, or operating status. This record targets research on the EG AI project and its planned capacity while clearly separating company claims, reported location, and unknown delivery milestones.
Questions
What is EG AI Rice?
It is a planned private-AI data-center project associated with Rice, Texas, and marketed by EG AI as a purpose-built, immersion-cooled GPU facility. The public evidence supports the project concept and reported location, but not a confirmed operating site address.
How much power does EG AI Rice use or plan to use?
EG AI publishes 2.5 MW of planned compute capacity. That is a company-reported design or compute figure; it is not proof of utility service, energized capacity, current IT load, or available customer power.
Is EG AI Rice operating?
No current operating state is established by the cited evidence. Industry reporting describes groundbreaking and a 2027 completion target, while EG AI’s own site presents the project as being built. Editorial copy should retain planned/reported language.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.