TYPE3’s map data identifies DataNovaX Pioneer Park at 2236 Airport Drive, Wichita Falls, with DataNovaX as operator. DataNovaX’s current website presents Pioneer Park as a build-to-suit campus serving hyperscale, government, enterprise, AI, and HPC deployments. It describes Phase I as a 37,000-square-foot facility with 12 MW of power available now and an expansion to 52 MW by December 2026. Phase II is described as a separate 550,000-square-foot facility with up to 150 MW of power capacity.
DataNovaX’s earlier specification sheet lists the same address and campus, but describes Phase I as 6 MW by December 2024 and Phase II as 150 MW. A recent Wichita Falls planning record reports approval for a conditional-use request for a data center inside the existing 2236 Airport Drive building, with city-stated 12 MW load and conditions including no evaporative cooling. These sources support a real project and entitlement path, but they do not prove that the current 12 MW is energized customer load or available to new buyers.
Phase I live/available claims, Phase I expansion, Phase II planned capacity, and TYPE3’s Announced/0 MW fields remain separate layers. Current construction and commissioning state, utility/interconnection basis, critical IT versus gross power, and remaining customer capacity are unconfirmed. The 202 MW directory aggregate is not current load and should not be summed from Phase I and Phase II.
Questions
What is DataNovaX Pioneer Park?
It is DataNovaX’s build-to-suit data-center campus at 2236 Airport Drive in Wichita Falls. The project targets hyperscale, enterprise, government, AI, and HPC users and is planned in multiple phases.
How much power does Pioneer Park use or plan to use?
DataNovaX currently reports 12 MW available for Phase I, expanding to 52 MW by December 2026, with up to 150 MW planned for Phase II. An older sheet says 6 MW for Phase I. These are phase and source-date claims, not one current available block.
Is Pioneer Park operating?
The project has operator marketing and a reported conditional-use approval, but TYPE3’s map data remains Announced and the reviewed sources do not independently verify full commissioning. Confirm the exact building, energized state, and customer availability with DataNovaX.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.