Digital Realty Richardson Campus — 1210 Integrity Drive
Overview
TYPE3’s map data identifies Digital Realty Richardson Campus as an operating wholesale/build-to-suit facility in Dallas County, with a 100 MW power field and a seven-building, 69-acre former Alcatel/Collins Technology Park description. Digital Realty’s current Dallas materials identify DFW18 at 1210 Integrity Drive, while a Texas Department of Licensing and Regulation record describes a roughly 290,000-square-foot data-center attachment to a three-story office building at that address. These sources support the physical site and operator identity.
The power field needs careful qualification. Digital Realty materials and related listings describe up to 100 MW of N+1 substation capacity; older Digital Realty investor material lists a larger Dallas campus substation figure and historical IT-load figures. A 2016 SEC supplemental explicitly distinguishes IT load from powered-base/building and nontechnical power. Those layers are not interchangeable, and TYPE3’s 100 MW should not be rewritten as current IT load, available power, or a customer allocation.
Use the page for Richardson campus discovery while preserving the relationship between 1210 Integrity/DFW18 and the broader Digital Dallas portfolio. Ask Digital Realty for the specific building, current critical-IT load, utility/substation scope, generator and UPS nameplate, and vacant capacity. Avoid adding child-building values to the parent campus or treating old investor figures as current.
Questions
Where is Digital Realty Richardson Campus?
The campus is associated with 1210 Integrity Drive in Richardson, Texas. Digital Realty identifies the location in its Dallas portfolio, and a TDLR record documents a data-center addition at that address. Building-level scope should be confirmed for a specific requirement.
Does the campus have 100 MW of available IT power?
No such conclusion is supported. TYPE3’s 100 MW field is tied to reported substation capacity, and older sources distinguish utility/powered-base layers from IT load. Current critical-IT load and vacant capacity require a Digital Realty quote.
Is the Richardson campus operating?
TYPE3’s map data marks it Operating, and current Digital Realty portfolio material supports the site identity. Operating status does not establish current vacancy, available MW, or the scope of every building in the parent campus.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.