Overview
TYPE3’s map data lists Duos Edge AI - Hereford EDC as an announced retail/network-colocation data center in Hereford at 601 N 25 Mile Avenue, with `0 MW`. Current first-party evidence materially updates that inventory status. Duos’s 13 January 2026 release says the company deployed a modular Edge Data Center in partnership with Hereford ISD. It describes on-premises, low-latency compute and connectivity for advanced educational technology, cloud-based learning platforms, and regional business applications, with wider community and workforce-readiness use cases.
Duos’s 9 June 2026 open-house release gives the exact address and says the event would showcase a facility already deployed with Hereford ISD. The release describes the EDC model as operating on on-grid power and requiring no water for cooling. That statement is about the deployment model; it does not disclose this site’s utility service, demand, or operating IT load. Duos also says its EDC platform can provide 100 kW or more per cabinet, but that is a generalized capability and must not be assigned to Hereford without a site sheet.
Hereford ISD independently published an invitation identifying the pod recently constructed behind its administration building at the same 601 N 25 Mile address. The matching operator and district sources support a verified identity and deployed status. The facility remains separate from both Amarillo Duos records, even though all three are part of the Texas Panhandle edge strategy. Rural connectivity and low-latency use cases are supported; the sources do not establish a measured flexible load, guaranteed AI tenant, or wholesale campus.
Questions
What is the Duos Edge AI Hereford EDC?
It is a modular edge data center deployed by Duos Edge AI with Hereford ISD at 601 N 25 Mile Avenue. The facility is intended to bring compute and connectivity closer to schools, businesses, and other local users.
How much power does the Hereford EDC use?
No site-specific MW or measured IT-load figure is published. Duos’s general 100 kW-plus-per-cabinet capability should not be read as the Hereford facility’s installed or operating load.
Is the Hereford EDC operating?
Duos describes the facility as deployed and hosted an open house for it in June 2026. Hereford ISD also identifies the constructed pod, so the record supports deployed status while leaving commercial load unreported.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.