Lumen McAllen 1 Data Center
Overview
TYPE3’s map data lists Lumen McAllen 1 as an announced retail/network-colocation facility operated by Lumen at 906 Beech Avenue, with `0 MW`. The address is supported by multiple public Lumen-related records. Lumen’s former CenturyLink Cloud public knowledge base lists McAllen at 906 Beech Avenue, gives the CLLI code `MCAMTXKN`, and includes it in an Edge Bare Metal location table. A 2021 Lumen SOC 2 report also lists a McAllen facility at the same address.
DataCenterMap provides detailed directory specifications: 6,015 square feet total, 1,754 square feet of dedicated colocation, AC UPS and DC power configurations, generator and battery backup, environmental controls, and diverse fiber. These facts can support a service-oriented description, but they are not a current Lumen capacity statement. No first-party current facility sheet or measured IT-load figure was found. TYPE3’s zero therefore means that no MW was supplied, not that the site consumes zero.
This facility is separate from MDC MCA1 at 200 S 10th Street, MDC MCA2 at 422 S 11th Street, and T-Mobile McAllen at 1400 E Upas Avenue. It is also distinct from Lumen Amarillo 1. Lumen’s edge-network role is relevant to McAllen’s border market, while current colo availability, utility service, and flexible-load potential remain unverified. The appropriate status is reported presence with unreported current power.
Questions
What is Lumen McAllen 1?
It is a reported Lumen / Level 3 heritage network and colocation facility at 906 Beech Avenue in McAllen. Public Lumen-related records support the address and service presence.
How much power does Lumen McAllen 1 use?
No current site IT-load or utility-MW figure is published. Directory references to UPS, DC power, generators, and batteries describe resilience infrastructure rather than measured demand.
Is Lumen McAllen 1 operating?
Lumen’s public location materials and SOC 2 report identify the facility, and current directories list services. Because a current first-party operating sheet was not found, use reported rather than independently verified status.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.