Prometheus TX-1 AI Data Center in Terrell
Overview
Prometheus TX-1 is listed in TYPE3’s map data as a hyperscale data-center project in Terrell, Texas, with Prometheus Hyperscale as developer or operator. The record is marked announced and contains no numeric power value in TYPE3’s power column. Its notes describe a 200 MW “AI Inference Factory” campus, an adjacent ENGIE battery energy-storage system, an existing grid connection, a 138 kV substation, and dual transmission lines.
Those technical details are useful context for the reported concept, but the current evidence does not establish them as verified project facts. The seed source is DataCenterMap’s Texas listing rather than a primary Prometheus announcement, utility interconnection filing, or public permit. The 200 MW figure is a reported design figure, not current IT load, contracted power, or energized capacity. The battery system is not evidence of resilience, dispatchability, or grid-services participation.
Prometheus TX-1 is a reported Terrell AI-inference project. No cited Prometheus, utility, or regulatory source confirms its address, construction, connection, or power architecture. The evidence does not show that the reported project has reached construction, connection, or operation. The 200 MW figure is a reported design figure, not current IT load, contracted power, or energized capacity, and the project’s facility and capacity details remain unresolved.
Questions
What is Prometheus TX-1?
It is a reported AI-inference data-center project mapped in Terrell, Texas.
Is Prometheus TX-1 a 200 MW operating facility?
No. The 200 MW figure is a reported design claim and is not verified as energized or operating.
Who supplies power to the project?
The map notes an adjacent ENGIE BESS and existing grid infrastructure, but a utility or interconnection source is still needed.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.