Skybox PowerCampus Austin DC3 — Hutto, Texas
Overview
TYPE3’s map data lists Skybox PowerCampus Austin DC3 in Hutto, operated by Skybox Datacenters, with `Announced` status and 0 MW. The row belongs to the six-child PowerCampus Austin cluster. Skybox’s current parent page describes a North Austin campus with up to 600 MW, 160 acres, up to 4 million square feet, and an on-site private substation. The operator’s Austin market page gives a separate current summary of 1,280,000 square feet and up to 400 MW of critical load. Those parent-level figures are useful context but are not DC3 measurements.
Skybox’s official brochure maps Building 3 to 469,000 square feet, 72 MW total load, and 48 MW critical load. The figures are presented in a multiple-building design table and should remain labeled as design criteria. They do not establish a completed building, live electrical service, tenant assignment, or available capacity. They also cannot be used to infer that DC3 is earlier, later, or more operational than the other child labels.
Skybox PowerCampus Austin DC3 has separate total-load and critical-IT design figures, with child delivery and availability unconfirmed. Verify the child permit, phase, site-plan identity, power delivery, construction milestone, customer allocation, and current orderable critical-IT capacity before updating the inventory state. Preserve TYPE3’s Announced/0 MW baseline and the parent/child relationship.
Questions
What is Skybox PowerCampus Austin DC3?
It is a map data child label in Skybox’s Hutto PowerCampus Austin development. The brochure provides a Building 3 configuration, while separate child commissioning and availability evidence remains outstanding.
How much critical power is planned for DC3?
The brochure lists 48 MW of critical load for Building 3 and 72 MW of total load. These are design values, not current measured or saleable IT capacity.
Does DC3 inherit the parent’s 600 MW?
No. The 600 MW figure describes the parent campus plan. It should not be divided or copied into the child records.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.