5CDC DFW01 Data Center
Overview
5CDC Dallas-Fort Worth DFW01 is a planned 5C Data Centers project in Fort Worth, not a confirmed operating facility. Public market records place it at 1201 John Burgess Drive, Fort Worth, Texas 76140, and describe a 25-acre campus with a multi-story building, eight data halls or PODs, high-density design, and a dedicated Oncor substation. Industry coverage has reported 48 MW of initial IT capacity and a possible expansion to 144 MW.
The capacity language must remain qualified. “48 MW of IT capacity” is a reported design or regional capacity figure, not a measured live load, energized service, or currently available customer inventory. Likewise, 144 MW is an expansion possibility, not operating capacity. The presence of an Oncor substation claim indicates an intended grid relationship but does not establish energization, interconnection approval, or delivered utility service. Keep those fields separate in the map model.
Searchers are likely to use several names: 5CDC, 5C Data Centers, DFW01, and Dallas-Fort Worth. The canonical page can lead with DFW01 and Fort Worth, then explain the operator naming. Do not collapse the campus with other Fort Worth developments or with Lumen Fort Worth 2, Cogent Fort Worth, or the DataBank Red Oak campus. A planned-page treatment is appropriate until a 5C primary project page, permit record, construction update, or customer-facing service page demonstrates the current state. The reported scope is commercially useful, with the project stage as the first answer.
Questions
What is 5CDC DFW01?
It is a planned 5C Data Centers project in Fort Worth, Texas, also called 5CDC DFW01 or 5C DFW01. Public descriptions identify a 25-acre campus with eight data halls and a dedicated Oncor-served substation.
How much power does 5CDC DFW01 use or plan to use?
Sources report 48 MW of initial IT capacity and expansion potential to 144 MW. These are planned or reported design figures, not proof of energized utility service, current IT load, or available colocation capacity.
Is 5CDC DFW01 operating?
Current operation is not verified. The available evidence describes a planned campus and reported design scope, so planned/development language remains appropriate until a current operator or regulatory source confirms construction and service readiness.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.