CyrusOne DFW10 — Whitney, Texas
Overview
TYPE3’s map data identifies CyrusOne DFW10 - Whitney as a wholesale/build-to-suit project in Whitney, Texas, with CyrusOne Data Centers as operator, Announced status, and 0 MW. Its note describes DFW10 as part of a new CyrusOne expansion outside the Dallas-Fort Worth core. The listed coordinates are 31.8526, -97.3718, while the source row uses a generic Texas DataCenterMap page rather than a facility-specific record. The live sheet supplies no tenant or commissioning evidence. No tenant assignment is reported.
TDLR Project TABS2025005284 provides primary project evidence. It identifies “CyrusOne DFW10 | Shell & Upfit,” DFW10, at 557 County Road 3610, Whitney, Bosque County, with approximately 250,000 square feet, an estimated $750 million cost, and a single-story data center with a two-story office component. The registration is project evidence, not proof of completion or energization. Data Center Dynamics reports DFW10 as part of the CyrusOne Whitney campus, adjacent to Calpine’s Thad Hill Energy Center, and reports a 400 MW full-buildout claim for the campus. That claim is a campus development layer, not DFW10 current capacity.
Keep DFW10 separate from DFW11 and DFW17A/B/C child rows, and separate CyrusOne’s data-center capacity from the adjacent generation plant. Do not publish 400 MW or any implied power as available IT load.
Questions
What is CyrusOne DFW10?
CyrusOne DFW10 is a planned data-center building in the Whitney area of Bosque County. TDLR identifies a roughly 250,000-square-foot shell and upfit project at 557 County Road 3610. It is one child of the broader CyrusOne Whitney campus.
Does DFW10 have 400 MW?
No verified DFW10 figure is available in the reviewed sources. The 400 MW number is reported as a full-buildout claim for the broader Whitney campus, while TYPE3’s map data records 0 MW. Adjacent Thad Hill generation is a separate asset.
Is DFW10 operating?
No. TYPE3’s map data marks it Announced, and TDLR shows a registered construction project. Registration and a planned completion date do not prove commissioning, energized IT load, or customer availability.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.