CyrusOne DFW17C — Whitney, Texas
Overview
TYPE3’s map data identifies CyrusOne DFW17C - Whitney as a wholesale/build-to-suit project in Whitney, Texas, with CyrusOne Data Centers as operator, Announced status, and 0 MW. Its note describes a 93,320-square-foot data center, a $430 million investment, and development from February 2026 through April 2027. The row source is a generic DataCenterMap Texas cross-reference, so the project is treated as reported rather than as a completed operating site.
Data Center Dynamics reports DFW17C as a distinct single-story building filed for the CyrusOne Whitney-area campus. It gives the approximately 93,320-square-foot footprint, estimated investment, and February 2026–April 2027 development window. The same reporting describes DFW17B and DFW17 as separate projects and notes location inconsistencies in nearby Whitney/Clifton and county-road references. Those inconsistencies should remain visible until CyrusOne or a final regulatory record provides a canonical address.
The reported investment and floor area are not electrical capacity. No current DFW17C IT load, utility interconnection, UPS/generator nameplate, tenant, or vacancy is established. Keep DFW17C linked to the CyrusOne Whitney parent for navigation, but never add its floor area or investment to the parent as capacity. Request construction and commissioning evidence before any operating claim. Its map data status remains Announced. No current customer allocation is documented.
Questions
What is CyrusOne DFW17C?
DFW17C is an announced CyrusOne child project in the Whitney-area campus. Public reporting describes an approximately 93,320-square-foot single-story building with a February 2026–April 2027 development window.
Is DFW17C operating?
No operating status is verified. TYPE3’s map data marks it Announced, and the reported dates describe development rather than commissioning. Confirm the final permit, construction progress, energization, and tenant assignment.
Does the $430 million figure indicate DFW17C’s power capacity?
No. It is a reported project investment, not IT load, utility service, or available capacity. TYPE3’s map data records 0 MW, and any Whitney campus or Thad Hill figures remain separate.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.