EdgeConneX EDCAUS02 — Cedar Creek, Texas
Overview
TYPE3’s map data lists EdgeConneX Austin - EDCAUS02 in Cedar Creek, operated by EdgeConneX, with `Announced` status and 0 MW. Public reporting identifies AUS02 at 8001 Wolf Lane and places it in Bastrop County, southeast of Austin. A July 2026 report says the building spans approximately 578,000 square feet across two stories and had a projected mid-2026 completion date. It also reports that CoreWeave will lease a building at the Cedar Creek campus, but the reviewed material does not establish a current EDCAUS02 occupancy or delivered IT load.
EdgeConneX’s Austin data sheet describes AUS01–04 as a multi-phase campus and assigns later phases a mix of one 48 MW building and two 96 MW buildings. Separate current trade reporting says EdgeConneX’s combined Austin sites will offer 240 MW and also describes AUS02 as associated with around 240 MW. Those statements are not interchangeable: they may refer to portfolio capacity, a project-level capacity target, or a broader buildout. Preserve the conflict rather than selecting a convenient number.
EdgeConneX EDCAUS02 has separate shell, phase, lease, utility, and IT-capacity evidence, with its delivered commercial state unconfirmed. Confirm the TDLR project number, final address, commissioning state, customer scope, and current orderable critical-IT capacity before changing TYPE3’s Announced/0 MW state.
Questions
What is EdgeConneX EDCAUS02?
It is TYPE3’s AUS02 facility record for EdgeConneX’s Cedar Creek data-center development in Bastrop County, near Austin. Public reporting describes a two-story, approximately 578,000-square-foot building at 8001 Wolf Lane.
Does EDCAUS02 have 240 MW?
The 240 MW figure is not safely treated as current EDCAUS02 IT capacity. Sources describe it inconsistently as Austin-market or AUS02 capacity, while an older EdgeConneX sheet describes AUS02–04 as separate later phases.
Is EDCAUS02 operating?
The reviewed evidence does not establish delivered IT service. It supports a major project and a projected completion window, but TYPE3’s map data remains Announced with 0 MW.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.