EdgeConneX Cedar Creek Campus — Cedar Creek, Texas
Overview
TYPE3’s map data lists EdgeConneX Cedar Creek Campus in Cedar Creek under EdgeConneX, with `Announced` status and 0 MW. EdgeConneX’s Austin data sheet identifies AUS01 at 6752 FM535 and describes a 920,000-square-foot, two-floor design. It lists 96 MW for the AUS01 first building and later AUS02–04 phases consisting of one 48 MW building and two 96 MW buildings. The operator’s Austin location material summarizes the combined sites at 240 MW.
These figures describe a campus and phase plan, not a current meter reading or a single saleable facility. TYPE3’s map data also contains separate AUS02, EDCAUS11, and EDCAUS12 records. EDCAUS11 and EDCAUS12 are filed at another Cedar Creek address and should remain separate from the AUS01–04 parent family unless the operator provides a formal topology. No reviewed source establishes a single current IT-load total, tenant allocation, or available MW for this parent row.
EdgeConneX Cedar Creek Campus is the relevant parent record for the Cedar Creek query, and its family structure is explicit. Parcel boundaries, current construction state, phase names, utility delivery, customer assignment, commissioned critical-IT capacity, and commercial availability remain unconfirmed. The 920,000-square-foot, 96 MW, 240 MW, and later phase figures stay source-labeled by scope; the campus is context for buyers, not a capacity promise.
Questions
What is EdgeConneX Cedar Creek Campus?
It is TYPE3’s parent record for EdgeConneX’s Austin-market development in Cedar Creek. Operator materials describe AUS01 and later AUS02–04 phases, while nearby EDCAUS11/12 filings remain separate records.
What does EdgeConneX’s 240 MW figure mean?
EdgeConneX presents 240 MW as a combined Austin-site figure. It is not a measured current load for the parent row and should not be copied to each child facility.
Is the Cedar Creek campus operating?
The reviewed material supports development and phase planning, but not a single current parent-campus operating or available-load figure. Confirm the latest building and utility milestones before publishing availability.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.