Edged Austin — Maxwell, Texas
Overview
TYPE3’s map data names this record Edged Austin and places it in Martindale, with Edged Energy as operator, `Announced` status, and 0 MW. The control state needs a location alias review: TDLR’s TABS2026019322 filing uses 11255 Hwy 142, Maxwell, in Caldwell County. Caldwell County’s own March 2026 recap describes the same broader project as an Edged-owned and operated data center in the Maxwell area near the LCRA Timmerman Powerplant. Use Maxwell/Caldwell County as the canonical published location and retain Martindale as an inventory alias only if the source relationship is documented.
The TDLR record describes a privately funded, one-level, 869,684-square-foot data-center building with an estimated $2.8 billion cost, a June 1, 2026 start date, and June 30, 2028 completion date. The county recap separately describes approximately 330 acres and $7.3 billion of estimated improvements. Those are building-filing and broader campus/incentive layers, not current IT capacity. No reviewed source establishes a customer, energized load, final commercial opening, or saleable MW.
Edged Austin’s public description answers the query, explains the Maxwell/Martindale naming issue, and separates permit scope from the larger county project. Its final address, owner/operator roles, utility path, generation or backup systems, commissioning milestone, and orderable critical-IT capacity still require confirmation before TYPE3’s Announced / 0 MW state changes.
Questions
Where is the Edged Austin data center?
The TDLR filing places it at 11255 Highway 142 in Maxwell, Caldwell County. TYPE3’s map data uses Martindale, so the published page should explain the alias rather than silently treating the two place names as separate projects.
How large is Edged Austin?
TDLR records an 869,684-square-foot ground-up building with a $2.8 billion estimated cost. Caldwell County separately describes a broader roughly 330-acre project with $7.3 billion of estimated improvements.
Is Edged Austin operating?
No current operating load is verified. TDLR records a project with a June 2026–June 2028 construction window, while county records describe a planned project and related agreement activity.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.