Prime Data Centers Caldwell County Campus — Texas
Overview
TYPE3’s map data identifies Prime Data Centers Caldwell County Campus as a wholesale/build-to-suit project in Caldwell County, with Prime Data Centers as operator, Announced status, and a 150 MW power estimate. Its notes describe a $400 million initial phase with two approximately 380,000-square-foot buildings, within a planned eight-building, roughly 2-million-square-foot, 206-acre campus outside Austin. Those dimensions and the power figure are planning information; they do not establish energized load or customer-ready capacity.
An official Caldwell County commissioners’ meeting record documents consideration of Prime Data Centers LLC Reinvestment Zone #1 and a proposed turnkey data-center campus. That public record supports the project’s governmental and economic-development context, but it does not independently verify TYPE3’s 150 MW estimate, final site design, utility interconnection, or construction completion. TYPE3’s Data Center Dynamics source provides the development narrative and estimate, while the county record provides primary public-record context.
The campus is an announced Caldwell County development, not an operating colocation facility. Keep initial-phase buildings, full-campus plans, estimated power, utility service, and available customer capacity in distinct fields. Before commercialization, request the project entity, site-control confirmation, TDLR permits, utility service agreement, energized date, critical-IT design, and current leasing status. Do not convert the 150 MW estimate into a saleable block.
Questions
What is Prime Data Centers Caldwell County Campus?
It is an announced Prime Data Centers wholesale/build-to-suit campus outside Austin in Caldwell County. TYPE3’s map data describes a multi-building plan, and county proceedings document a proposed Prime turnkey data-center campus. Final construction and operating details remain subject to verification.
How much power will the Caldwell County campus have?
TYPE3’s map data records a 150 MW estimate. That number is not confirmed energized IT load, utility service, or customer-ready capacity. Editorial copy should retain the estimate label and request a current critical-IT and interconnection disclosure before quoting availability.
Is the Prime Caldwell County campus operating?
No operating date is verified. TYPE3’s map data status is Announced, and the reviewed county record concerns a proposed campus and economic-development agreements. Permits, construction progress, energization, and customer deployments require separate confirmation.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.