Nexus Hubbard Campus — Hubbard, Texas
Overview
TYPE3’s map data identifies Nexus Hubbard Campus as a wholesale/build-to-suit data-center proposal in Hubbard, Hill County, with Nexus Data Centers as operator, Announced status, and 0 MW. Its note describes a 600 MW natural-gas-powered campus on 2,000 acres with water-harvesting technology, based on a generic DataCenterMap cross-reference. That description is a development concept, not proof of land control, permits, construction, generation, or data-center energization.
Data Center Dynamics reported a proposed 600 MW natural-gas-powered campus near Hubbard and later reported a TDLR filing for Nexus Apex DFW HB1 at 357 HCR 3372. The filing describes an approximately 491,380-square-foot building, a $400 million project, and construction from January 2026 through October 2027. Other public reporting uses 612 MW and a broader 2,900-acre energy-campus concept. Those are different program, generation, and building scopes. A TCEQ-related public record identifies a pending air-permit application, which is not an issued permit and does not establish operation.
Keep the data-center building, behind-the-meter generation, water system, broader land area, and full-campus plan separate. Do not publish 600/612 MW as current IT load or available customer power. Request final permits, utility/generation configuration, construction status, IT design, tenant commitments, and commissioning evidence. The pending air-permit record is not an operating certificate.
Questions
What is Nexus Hubbard Campus?
It is a proposed Nexus Data Centers campus and behind-the-meter energy project near Hubbard, Texas. Public reporting describes a large natural-gas-backed program, while a TDLR filing identifies a separate Nexus Apex DFW HB1 building project.
Is Nexus Hubbard a 600 MW or 612 MW data center?
Both figures appear in public development reporting with different scopes or dates. They describe a planned program and associated generation concept, not verified current IT load. TYPE3’s map data records 0 MW and the project remains Announced.
Is Nexus Hubbard operating?
No. TYPE3’s map data marks it Announced. TDLR and air-permit records describe proposed or pending development, and reported construction extends into 2027. Permits, energization, commissioning, and customer service require separate confirmation.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.