PowerHouse Irving Campus — Irving, Texas
Overview
TYPE3’s map data identifies PowerHouse Irving Campus as a wholesale/build-to-suit project operated by PowerHouse Data Centers in Irving, Texas. It is marked `Announced` with 0 MW, with coordinates 32.8883, -96.9400. The row’s note describes a 50-acre, state-of-the-art campus, while current PowerHouse material provides multiple scale and schedule figures. These should be dated and labeled rather than treated as one current capacity number.
PowerHouse’s project page lists 50 acres, 946,200 developable square feet, up to three buildings of up to three stories, 201 MW maximum utility power, and Q1 2026 delivery. Its May 2024 announcement identifies the site at 111 Customer Way, describes a nearly one-million-square-foot campus expected to deliver 200 MW when complete, and says three powered-shell data centers would total more than 946,000 square feet with 67 MW per building. It also says permanent power is available from an adjacent Oncor-served substation and that first-shell delivery was planned for late 2025.
The current page’s 201 MW utility figure, the announcement’s 200 MW completed-campus figure, and 67 MW-per-building language are not equivalent measures of current IT load. A powered shell is not a commissioned tenant load. Keep buildings, utility service, shell delivery, customer fit-out, and availability separate. Request current construction, energization, tenant assignment, critical-IT load, and remaining capacity before commercial publication.
Questions
What is PowerHouse Irving?
It is a planned three-building powered-shell campus in Irving-Las Colinas at 111 Customer Way. PowerHouse describes a 50-acre site with roughly 946,200 developable square feet and future hyperscale-oriented infrastructure.
Does PowerHouse Irving have 200 or 201 MW?
PowerHouse’s current page lists 201 MW of maximum utility power, while its announcement described 200 MW when complete and 67 MW per building. These are utility, campus, and building planning layers, not verified current or available IT load. TYPE3’s map data records 0 MW.
Is PowerHouse Irving operating?
Operating status is not verified. PowerHouse gave 2025–2026 delivery targets, but TYPE3’s map data remains Announced with a blank operational field. Confirm shell completion, tenant fit-out, energization, commissioning, and capacity.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.