TYPE3’s map data identifies QTS South Dallas DC7 as a wholesale/build-to-suit data-center project operated by QTS Data Centers in Wilmer, Texas. It is marked `Announced` with 0 MW, and its note describes a 363,500-square-foot two-story building with construction starting in September 2026. The row coordinates are 32.5805, -96.7029. The live row’s Wilmer location and TDLR’s Lancaster situs are a municipal/address presentation issue within the same South Dallas development area.
TDLR project TABS2026016944 identifies QTS DFW2-DC7 at 1341 Sunrise Road, Lancaster, Dallas County. The registration describes new construction, a two-story office and shell data-hall building, an estimated $290 million cost, a September 1, 2026 start, and a December 1, 2027 completion date. TDLR lists no tenant. The project page’s scope states 363,500 square feet, while its structured square-footage field displays 3,635,000 square feet; use the scope figure and retain the data-quality discrepancy.
QTS’s South Dallas page identifies the broader campus as a new Texas campus located in Wilmer, 15 miles south of Dallas. DC7 is a child record, not the campus total. Keep DC7 separate from DC5 and DC6, other DFW2 buildings, utility service, shell space, and any parent capacity. Request construction progress, energization, critical-IT design, tenant, and availability before publication.
Questions
What is QTS South Dallas DC7?
It is a planned QTS building in the South Dallas/DFW2 campus. TDLR identifies it as DFW2-DC7 at 1341 Sunrise Road in Lancaster, while QTS describes the broader campus as being in Wilmer.
How large is DC7?
TDLR’s project scope describes a two-story building of 363,500 square feet with office and shell data-hall space. The page’s structured square-footage field displays a conflicting 3,635,000-square-foot value, so the scope figure should be used cautiously.
Is DC7 operating?
No. TYPE3’s map data marks it Announced, and TDLR lists the project as registered with a future September 2026 start and December 2027 completion target. Registration and a schedule do not prove energization or available IT capacity.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.