SDC Austin Building B — Round Rock, Texas
Overview
TYPE3’s map data lists SDC Austin - Building B in Round Rock under Sabey Data Center Properties LLC, with `Announced` status and 0 MW. Sabey’s July 2025 announcement says construction began on a three-story Building B designed to deliver 54 MW of power capacity, with the first 18 MW expected to be ready for service in Q3 2027. TDLR’s TABS2025004394 record identifies the project at 1300 Louis Henna Boulevard and describes a privately funded, approximately 400,000-square-foot data-center core and shell with an estimated completion date of September 2026.
Sabey’s current Austin page describes the broader Round Rock campus as 603,300 square feet with up to 84 MW of critical IT load. That is a parent-campus figure, not a measured Building B load, and it should not be added to the building-specific 54 MW design number. Likewise, a construction completion date is not proof that customer IT equipment is energized or that inventory is available for lease.
SDC Austin Building B’s published description distinguishes its core-and-shell work, planned total capacity, initial ready-for-service tranche, critical IT load, and commercial availability. Its commissioning milestone, energized IT load, tenant allocation, and orderable capacity still require confirmation before TYPE3’s map data baseline changes. Building B links to the SDC Austin parent as a child without duplicating parent totals.
Questions
What is SDC Austin Building B?
It is Sabey’s second building at its Round Rock, Texas, Austin-market campus. TDLR identifies a core-and-shell project at 1300 Louis Henna Boulevard, while Sabey describes a three-story building designed for enterprise and hyperscale deployments.
How much power is planned for Building B?
Sabey says Building B is designed for 54 MW, with the first 18 MW targeted for ready-for-service in Q3 2027. Those are planned delivery figures, not proof of current energized IT load.
Is SDC Austin Building B operating?
Construction and a TDLR project record are documented, but the reviewed sources do not verify operating customer load or current availability. Retain TYPE3’s Announced / 0 MW baseline until commissioning evidence is confirmed.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.