Skybox Round Rock — Old Settlers Boulevard
Overview
TYPE3’s map data lists Skybox Round Rock with Skybox Datacenters as operator, Round Rock as location, Announced status, 0 MW, and coordinates 30.5425, -97.6452. Its note reports a 250,000-square-foot data-center development and 75 MW of grid-connected capacity. Those figures are broadly consistent with the city’s later PUD conditions, but TYPE3’s site pin is not a published street address and the project is not an operating inventory block.
The City of Round Rock’s data-center page describes the Skybox Old Settlers Planned Unit Development, PUD25-00009, on approximately 29.69 acres east of N. A.W. Grimes Boulevard and south of East Old Settlers Boulevard. Following a neighborhood meeting, the city says the PUD limits the site to one primary data-center building, a maximum 250,000 square feet, a maximum height of 60 feet, and 75 MW of grid-interconnected power. It also requires closed-loop cooling and places an electric substation or light-industrial use on a separate parcel area.
The city’s PUD index lists Skybox Old Settlers as PUD #159 with a February 12, 2026 date and data-center/major-utility zoning. These are strong municipal approvals, but they do not prove construction completion, energization, tenant commitment, critical-IT load, or saleable availability. Keep the 75 MW figure labeled as a zoning or grid-connected cap. Do not reuse it for Skybox Austin in Pflugerville, Skybox PowerCampus Austin in Hutto, or any future child record.
The record answers the local project questions: where the approved project is, what the PUD allows, and what remains unknown. Announced/0 MW remains in place until a construction, utility, or operator source establishes a later state.
Questions
What is Skybox Round Rock?
It is Skybox Datacenters’ approved Old Settlers Boulevard development in Round Rock. The city’s PUD allows one primary data-center building on approximately 29.69 acres, with a 250,000-square-foot maximum and a separate utility parcel. It is distinct from Skybox Austin in Pflugerville.
How much power will Skybox Round Rock use?
The approved PUD caps grid-connected power at 75 MW. That is a municipal development and utility limit, not measured IT load, energized capacity, or saleable availability. TYPE3’s map data keeps the row at 0 MW until later project evidence supports a different state.
Is Skybox Round Rock operating?
No reviewed source establishes operation. Round Rock approved the PUD in February 2026, but approval is not construction completion or energization. Publish the project as an approved development and preserve TYPE3’s Announced status and blank operational field.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.