Amazon AWS Horizon Junction Campus — Floydada
Overview
Horizon Junction is a planned Amazon Data Services campus near Floydada, Texas. TYPE3’s parent entry uses the address range 1762–1782 County Road 241, identifies Amazon AWS, and marks the campus announced with zero MW. TDLR filings provide a building-level structure: Building B is at 1762 County Road 241, Building C at 1774, and Building D at 1782. Each filing describes a new data-center building of 189,060 square feet with an estimated $300 million cost and submitted construction dates beginning August 1, 2026 and ending April 1, 2027.
The records list Amazon Data Services Inc. as owner and Gensler as design firm. They do not disclose tenant workload, critical IT load, utility energization, or operational status. Building D’s returned project record does not populate a current status field, so the evidence does not support an upgrade beyond the filed status. Data Center Dynamics groups the filings under the Horizon Junction project name, supporting the parent-campus relationship.
The filed evidence supports a Floydada-area Amazon campus with three identified building addresses, disclosed square footage, and unknown load. Horizon Junction is the parent campus, while Buildings B, C, and D remain distinct address-level projects. Their areas and estimated costs do not establish total MW. Telemetry, dispatch, and demand-response claims remain unsupported until a verified operating source exists.
Questions
How many buildings are in Amazon Horizon Junction?
The cited TDLR filings identify at least three: Buildings B, C, and D on County Road 241 near Floydada.
How much power will Horizon Junction use?
The filings disclose no IT-load or operating-MW figure. Building size and estimated cost are not substitutes for measured power data.
Is Horizon Junction operating?
The cited filings support planned, registered construction. They do not establish that the campus or any listed building is operating.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.