Project Dorothy is an umbrella campus record, not one undifferentiated load block. TYPE3’s map data names Soluna Computing, gives 9985 County Road F near Silverton, Texas, and records Announced with 0 MW. Soluna’s project portfolio describes Dorothy 1A and 1B as a 50 MW wind-powered data center used for Bitcoin hosting and mining. Its 2025 results update describes Dorothy 2 as a 48 MW completed and operational project.
Soluna separately presents Dorothy 3 as a planned renewable-powered AI campus adjacent to Dorothy 1 and 2, with a listed 300 MW capacity. The Q2 2026 update is a distinct dated source for that AI phase. The 50 MW, 48 MW, and 300 MW figures belong to different phases and statuses; they cannot be summed into current campus load. Bitcoin-mining infrastructure and planned AI infrastructure also remain separate workload categories.
The renewable and curtailed-energy story explains why the campus appears in searches for flexible computing and load shifting. It does not document ERCOT program enrollment or on-command curtailment for every phase. The map record should retain its single-row identity while showing the parent campus and child-phase relationship. Its site pin and 9985 County Road F address need verification before public indexing.
The campus name therefore describes a relationship among assets, not a single operating measurement.
Questions
How much power does Project Dorothy have?
The phases differ: Dorothy 1 is described as 50 MW, Dorothy 2 as 48 MW in Soluna’s 2025 update, and Dorothy 3 as a separate planned 300 MW AI campus. Those figures are not one current total.
Is Project Dorothy an AI data center or a Bitcoin mine?
The campus includes Bitcoin hosting and mining phases. Dorothy 3 is described as planned AI infrastructure in Soluna’s 2026 update, so the workload history should remain phase-specific.
Where is Project Dorothy?
TYPE3’s map data places the campus near Silverton, Texas, at 9985 County Road F. The address and map pin still require parcel-level verification.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.