CleanArc Dallas — Stemmons Corridor, Texas
Overview
TYPE3’s map data identifies CleanArc Dallas as a wholesale/build-to-suit development in Dallas, with CleanArc Data Centers as operator, Announced status, and 0 MW. Its note reports a 245 MW development on a 40-acre Crow Holdings site in the Stemmons Corridor, with initial delivery language. TYPE3’s map data source is a generic DataCenterMap Texas page, so current first-party project material is the controlling development reference.
CleanArc’s February 2026 announcement says it was selected to lead development and leasing for Crow Holdings’ 245 MW flagship campus in central Dallas. It describes a multi-building campus on 40 acres near the Infomart and 2323 Bryan Street, with Phase I’s first 70 MW building targeted for late 2027. The announcement also says design, long-lead procurement, and substation planning were underway. These statements establish an announced development program, not energized load, completed construction, or a 245 MW customer-ready block.
Keep CleanArc’s developer/leasing role separate from Crow Holdings’ land ownership and any neighboring carrier hotels or existing facilities. The 70 MW Phase I building is not the entire campus, and substation planning is not IT load. Request permits, construction progress, utility agreement, building delivery, tenant commitments, and remaining availability before commercial publication. Current construction progress remains unverified. No commissioning record is available.
Questions
What is CleanArc Dallas?
It is a planned CleanArc/Crow Holdings data-center campus in Dallas’s Stemmons Corridor. CleanArc is leading development and leasing, while the project announcement describes a 245 MW multi-building program and a first 70 MW building targeted for late 2027.
Is 245 MW available at CleanArc Dallas?
No. The 245 MW figure is the planned full-campus program, and the 70 MW figure is a Phase I building target. Design and substation planning do not prove energized or vacant IT capacity. TYPE3’s map data records 0 MW.
Is CleanArc Dallas operating?
No operating status is verified. TYPE3’s map data marks it Announced, and CleanArc’s announcement describes design, procurement, and planning for future delivery. Construction, energization, tenant assignment, and launch require later evidence.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.