CloudHQ SAT1 — San Antonio, Texas
Overview
TYPE3’s map data lists CloudHQ SAT1 in San Antonio under CloudHQ, with `Announced` status, 0 MW, and 15255 Lambda Drive. CloudHQ’s operator campus page does not isolate SAT1’s square footage or MW. It describes the campus as five planned customizable data centers totaling 3,023,300 square feet and 600 MW of critical IT load, with RFS within 2027. DCD’s 2023 land story supports the campus acquisition of about 123 acres from the University of Texas System, not a SAT1 building permit.
A Central Texas tracker states that CloudHQ began SAT1 construction in October 2025 at 15355 Lambda Drive: a two-story, 432,800-square-foot building for up to 96 MW of critical IT capacity and $276.8 million, completing August 2027. Those numbers are the same building size, MW, cost, and schedule that TDLR TABS2026001234 records for Vantage Data Center TX12 at 17420 Omicron Drive. Until CloudHQ or TDLR produces a SAT1-specific filing, 96 MW and 432,800 square feet remain unconfirmed CloudHQ SAT1 facts.
SAT1 is the first-named child of the Lambda Drive campus, with the 15255 versus 15355 address conflict flagged. Parent 600 MW, campus acreage, substations, and fiber laterals remain parent scope. The TDLR project number, owner entity, pad, construction state, utility delivery, tenant, and available IT require confirmation before any status change.
Questions
What is CloudHQ SAT1?
It is the first named building in CloudHQ’s planned five-building SAT Campus at Lambda Drive in San Antonio. It is a child of the campus, not the 600 MW parent page.
Did SAT1 start construction in 2025 at 96 MW?
A secondary tracker says so, but the cited size, MW, cost, and 2027 completion match Vantage TX12’s TDLR record on Omicron Drive. Do not treat that as a confirmed CloudHQ SAT1 design.
Is CloudHQ SAT1 operating?
No verified operating load or availability was found. Keep TYPE3’s map data Announced / 0 MW until a SAT1-specific primary record is confirmed.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.