Vantage TX11 — San Antonio, Texas
Overview
TYPE3’s map data identifies Vantage TX11 - San Antonio as a wholesale/build-to-suit facility at 14720 Omicron Drive, operated by Vantage Data Centers, with Announced status and 0 MW. TDLR provides direct address and building evidence. The original TX11 filing describes a two-story, 242,667-square-foot data center with total 32 MW capacity distributed across four 8 MW data halls. A later TX11 OPEL Fit-Up filing at the same address describes a 32 MW tenant buildout and is marked Inspection Complete.
TCEQ’s federal operating-permit notice also identifies Vantage Data Centers TX11, LLC at 14720 Omicron Drive and the Vantage TX 11 data-processing facility. That regulatory record supports the facility identity and permitted operational context, but a permit or inspection status does not equal energized IT load, customer occupancy, or available capacity. Public records reviewed do not establish current metered load.
TX11 must remain distinct from TX12 at 17420 Omicron Drive. It is also distinct from the broader TX1 campus parent and from any occupant/tenant record. TYPE3’s Announced/0 MW state remains unchanged for editorial control. Use 32 MW only as filed building/design and tenant-fit-up capacity. Before publication of a commercial availability statement, obtain current Vantage confirmation of energization, occupied halls, critical-IT load, utility and backup layers, and remaining capacity.
Questions
What is Vantage TX11?
Vantage TX11 is a Vantage data-center building at 14720 Omicron Drive in San Antonio. It is a child building in the TX1 campus context and must remain separate from Vantage TX12 at 17420 Omicron Drive.
How much power does Vantage TX11 have?
TDLR filings describe 32 MW across four 8 MW data halls, including a later 32 MW tenant fit-up. That is filed design/buildout capacity. It is not a current metered-load or available-capacity disclosure.
Is Vantage TX11 operating?
TYPE3’s map data says Announced. A TDLR fit-up record is inspection complete and TCEQ has a federal operating-permit process, but neither proves current energization or occupancy. Retain a qualified status pending Vantage confirmation.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.