CloudHQ SAT4 — San Antonio, Texas
Overview
TYPE3’s map data lists CloudHQ SAT4 in San Antonio under CloudHQ, with `Announced` status, 0 MW, and a notes pin at 15255 Lambda Drive. CloudHQ’s official SAT Campus page identifies a planned five-building campus west of San Antonio on the former University of Texas Health Science Center site. It reports 3,023,300 square feet, 600 MW of available critical load, 600 MW of total critical IT load, multiple on-site substations, four fiber laterals, and ready-for-service within 2027. Data Center Dynamics reported the 2023 acquisition of about 123 acres from the University of Texas System, across from Microsoft’s Lambda Drive campus.
SAT4 is one of the named children of that parent, alongside SAT1, SAT2, SAT3, and SAT5. Secondary listings repeat the 15255 Lambda Drive address for SAT4; at least one marketplace page uses 15355 Lambda Drive and an 84 MW full-build critical-load claim. Neither CloudHQ’s campus page nor the reviewed TDLR record set assigns SAT4 a unique square footage, MW allocation, construction start, or lease state. The 84 MW figure is a secondary child claim, not verified IT load or a share of the parent 600 MW.
SAT4 is presented as a discovery child of the Lambda Drive campus. Campus acreage, 600 MW critical IT, substations, fiber laterals, and RFS timing remain on the parent page. The exact building pad, TDLR identifier, utility delivery, tenant, energized load, and orderable capacity require confirmation before TYPE3’s map data moves off Announced / 0 MW.
Questions
What is CloudHQ SAT4?
It is a named child building on CloudHQ’s planned SAT Campus at 15255 Lambda Drive in San Antonio. CloudHQ describes five planned customizable data centers on the former UT Health Science Center site; SAT4 is not the parent campus page.
How much power will SAT4 have?
No first-party SAT4 MW figure was verified. CloudHQ’s 600 MW critical-IT claim is campus scope. An 84 MW secondary listing is not confirmed operating or design load for this child.
Is CloudHQ SAT4 operating?
Not on the reviewed record. TYPE3’s map data remains Announced / 0 MW, and CloudHQ’s campus materials describe a planned campus rather than a commissioned SAT4 building.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.