Overview
DataBank’s current Plano campus page identifies a 16-acre campus at 8375 Dominion Parkway, Plano, Texas 75024. The parent page contains two child facilities: DFW3 with 72,230 IT square feet and 12 MW of critical IT load, and DFW8 with 126,000 IT square feet and 40 MW of critical IT load. DataBank reports 43 onsite carriers for each child and describes metro connectivity through Data Center Interconnect.
The parent-versus-child relationship is the central editorial issue. The campus total of 198,230 IT square feet and 54 MW is the sum of DataBank’s two published child metrics, but the parent page should not be counted as a third building. A reader searching for DFW3 or DFW8 should land on an address-specific child page with the child’s own capacity label, while the campus page explains the shared property, dual feeds, and relationship to DataBank’s wider Dallas portfolio.
DataBank describes the Plano campus as powered by dual feeds from an off-site Oncor substation. That is useful grid-relevance context, but it does not state the campus’s utility service limit, current draw, or available customer capacity. “Critical IT load” is an operator design metric and should remain separate from live IT load, generator capacity, and sellable inventory. The current operator page supports an active customer-facing campus identity, so this record can use verified language while retaining the field definitions exactly.
Questions
What is DataBank Plano Campus?
It is DataBank’s 16-acre Plano campus at 8375 Dominion Parkway, containing two distinct buildings: DFW3 and DFW8. The campus page is the parent record; each building should retain its own canonical facility page and metrics.
How much power does DataBank Plano Campus have?
DataBank publishes 54 MW of combined critical IT load across DFW3 and DFW8: 12 MW for DFW3 and 40 MW for DFW8. These are operator design labels, not current consumption, utility service, or available customer capacity.
Is DataBank Plano Campus operating?
Yes, DataBank currently presents the Plano campus and both DFW3 and DFW8 as customer-facing data-center locations. That operating identity does not make the 54 MW figure a measured live load or guarantee vacant capacity.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.