EdgeConneX Cedar Creek Campus — Bastrop County
Overview
TYPE3’s map data lists EdgeConneX Cedar Creek Campus as a construction-stage wholesale/build-to-suit facility in Bastrop County. Its notes describe a 130-acre first phase expanding to 180 acres, CoreWeave as a reported capacity customer, and a campus estimate of approximately $1.44 billion. TYPE3’s map data power field is 96 MW. These are campus and development figures, not evidence of vacant or generally saleable power.
Texas project records identify an EdgeConneX/AI campus with a four-building county agreement. A state-facing facility record associates AUS02 with CoreWeave and describes a 578,000-square-foot, approximately $440 million building at the Cedar Creek site. Data Center Dynamics likewise reports CoreWeave leasing capacity from EdgeConneX and a 578,000-square-foot building. Those sources support the customer/project relationship but do not establish that all 96 MW is energized, uncontracted, or available to other customers.
Keep the EdgeConneX campus parent distinct from the individual building and CoreWeave occupancy layer. Report construction and delivery state from current project evidence; do not turn a reported lease, county estimate, or phase figure into a generic colocation offer. For a commercial page, request the exact building, energization milestone, critical-IT design, utility interconnection, contracted customer scope, and remaining availability today. The reported campus valuation is also not a power or revenue metric.
Questions
What is the EdgeConneX Cedar Creek Campus?
It is an EdgeConneX data-center development in Bastrop County near Austin. Public project records describe a multi-building campus, and reporting links CoreWeave to capacity in a building. The campus remains a construction-stage record in TYPE3’s map data.
Does the 96 MW belong to CoreWeave or to the whole campus?
TYPE3’s map data records 96 MW for the campus row, while sources describe a separate building and a reported CoreWeave capacity relationship. The available evidence does not support assigning the full campus figure to CoreWeave or offering it to other customers.
Is EdgeConneX Cedar Creek operating?
TYPE3’s map data marks it Construction. Some sources discuss a building, customer, or construction progress, but they do not prove full-campus energization or general availability. Verify the specific building and commercial status before publication.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.