Edged Dallas-Fort Worth DFW02 — Fort Worth, Texas
Overview
TYPE3’s map data lists Edged Dallas-Fort Worth DFW02 in Fort Worth with Edged Energy as operator, Announced status, and 0 MW. The note cites a Fort Worth campus with PMB Capital Investments. Live coordinates are 32.68904, -97.49416. Edged’s first-party Dallas page now treats Irving and Fort Worth as separate submarkets on one regional page: Irving is DFW01-1 and DFW01-2 at 48 MW; Fort Worth is DFW02-1 at 196 MW.
TDLR TABS2026020386, registered 15 May 2026, names Edged Energy Outpost, owner EDC Fort Worth LLC, MG2, 488,770 square feet, $300 million, 27 July 2026–30 December 2027, status Review Complete, no wattage. DCD (29 May 2026) matches that filing. Star-Telegram (14 August 2026) reports a commercial permit for a 488,628-square-foot, 196 MW building at 9720 Team Rockbrook Parkway; an address that did not resolve in maps or TAD at publication. City materials described a $1.1 billion two-phase commitment; the tax-abatement request was withdrawn. Marketing copy of two ~450,000-square-foot buildings plus a dedicated Oncor substation remains a development/utility layer.
Keep DFW02 off Edged DFW01 Campus (this batch) and off Prime DFW04 at Aledo and Chapin School Road (SEO-029). Do not publish 196 MW, $1.1 billion, or the Oncor substation as saleable IT. Preserve Announced / 0 MW.
Questions
Is DFW02 the same as Edged Irving?
No. Irving is DFW01 at 300 North Loop 12 / 505 N Wildwood. DFW02 is Fort Worth at Chapin School Road.
Is 196 MW available?
No. 196 MW is a campus/development figure on Edged’s page and in permit copy. TDLR lists no MW. TYPE3’s map data is 0 MW.
Which street address is canonical?
TDLR and Edged use 9999 Chapin School Road. Star-Telegram’s 9720 Team Rockbrook Parkway did not resolve. Leave the conflict labeled.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.