Infomart Dallas — Building and Interconnection Hub
Overview
Infomart Dallas should be modeled as a parent-building record rather than a duplicate of one Equinix suite. Equinix’s acquisition announcement describes the Dallas Infomart as a major interconnection hub and identifies DA1, DA2, DA3, and DA6 as Equinix data centers within the building. Equinix’s sustainability reference separately lists DA3, DA6, and DA99 at the 1950 North Stemmons address and notes that DA99 is an Infomart data center, not an IBX.
Regulatory evidence adds a current building-level signal: TDLR record TABS2025003482 describes a 2024–2025 renovation of Suites 6000 and 6040, covering 43,000 square feet, with Equinix LLC as owner and the project marked closed. That record is a construction/renovation record, not evidence of total data-center power or customer availability.
For organic search, the parent page should answer what Infomart is, where it is, and how its child facilities relate. It should link to separate canonical pages for DA1, DA2, DA3, DA6, DA99, and any non-Equinix operator record that is independently verified. It should not copy a child suite’s square footage into a building total, add IBX MW figures, or imply that every tenant shares one operating profile. TYPE3’s announced/zero-MW seed should be retained in the audit trail while current building ownership and tenant relationships are refreshed. This structure reduces duplicate pages and gives researchers a reliable way to move from a building search to a suite-specific facility.
Questions
What is Infomart Dallas?
Infomart is a large Dallas technology and interconnection building at 1950 North Stemmons Freeway that contains multiple distinct data-center and IBX records.
Is Infomart the same as Equinix DA3?
No. DA3 is one Equinix IBX within Infomart. Infomart is the parent-building record; DA3 is identified by specific suites and its own technical profile.
How much power does Infomart Dallas have?
The cited building and regulatory sources do not publish a total Infomart MW figure or current available capacity. Child-facility metrics must not be summed without a defined boundary.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.