IREN Childress Data Center, 750 MW AI Infrastructure Campus
Overview
IREN’s Childress campus is in Childress, Texas, on a 576-acre freehold site. IREN’s current facility page reports 750 MW of total capacity, dual physically diverse fiber paths, and direct connection to the ERCOT grid through on-site substations owned by IREN. TYPE3’s map data identifies a facility at 620 Farm to Market Road 1033, lists it as announced, and records zero MW. That map summary is stale relative to IREN’s current first-party profile, while the address and coordinate precision still require field-level review.
The 750 MW figure is total capacity. It does not establish 750 MW of energized, contracted, leased, or available IT load. IREN positions the campus for AI cloud, build-to-suit, and colocation use, but those are company-described use cases rather than proof of a specific customer deployment. Direct ERCOT connection also does not guarantee delivery of a particular amount of power.
Childress combines a large freehold site, dual fiber paths, and direct ERCOT connection with a 750 MW total-capacity claim. Those attributes make the campus relevant to infrastructure diligence, but they do not answer how much compute is energized or committed. A current IREN filing or site update could reconcile TYPE3’s map data address and coordinates and establish that separate load evidence. Until then, 750 MW remains a total-capacity statement, not a live availability claim.
Questions
How large is IREN Childress?
IREN reports 750 MW of total capacity on its current facility page.
Is 750 MW the current available IT load?
Not necessarily. IREN labels it total capacity, so energized, contracted, and available load require separate evidence.
Is IREN Childress connected to ERCOT?
IREN says the facility is directly connected to the ERCOT grid through on-site substations owned by IREN.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.