Project Hutto — Withdrawn Data Center Proposal
Overview
TYPE3’s map data lists Project Hutto under Zydeco Development in Hutto, with `Announced` status and 0 MW. That status is stale against the City of Hutto’s April 17, 2026 notice: Zydeco formally withdrew its request to rezone the parcel at 450 Ed Schmidt Boulevard, and the special planning and zoning meeting set for April 20 was canceled. The city also says the proposal required changes to the future land-use map and SOAR 2040 Comprehensive Plan, and that development services staff had recommended against approval.
The original inventory note reports a 950,000-square-foot, 70 MW project. Public reporting is inconsistent on the proposed building size, with some accounts describing a smaller 225,000-square-foot concept. Treat both size references as historical proposal claims, not final design. The 70 MW number is likewise a requested or planned capacity figure, not delivered IT load. The withdrawal means there is no evidence in the reviewed sources of construction, energization, tenant commitment, or saleable capacity.
The page has value as a status-sensitive record: it answers a recognizable Hutto data-center query while preventing an obsolete announcement from appearing live. Use “withdrawn proposal” in the title, summary, and status treatment. Keep the original row available for provenance, but do not import it into a current availability or operating inventory without a formally documented resubmission.
Questions
What was Project Hutto?
It was Zydeco Development’s proposed data center at 450 Ed Schmidt Boulevard in Hutto. The project sought land-use and rezoning changes for a site previously designated for other development, but the request was withdrawn.
Was Project Hutto a 70 MW data center?
70 MW was reported as the requested or planned power figure. It was never verified as energized IT load, and the proposal’s building-size reporting also conflicts between sources.
Is Project Hutto still moving forward?
The City of Hutto says Zydeco withdrew the rezoning request on April 17, 2026, and the scheduled planning meeting was canceled. No approved, operating, or available facility is established by the reviewed record.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.