TYPE3’s map data identifies CTX2 as a Serverfarm facility in Houston, with `Announced` status, 0 MW, and a site-precision coordinate near 15555 Cutten Road. The TDLR project record, registered as TABS2025014250, gives the project address, Harris County location, 438,000-square-foot scope, $137 million estimated cost, HKS as design firm, and July 10, 2026 completion date. Those fields describe a permitted construction project, not energized customer load.
Serverfarm’s February 2026 CTX2 milestone adds current construction context: the company says the structure topped out after breaking ground in July 2025, with MEP installation and commissioning next. The same update describes a 60 MW facility engineered with waterless air-cooled chiller technology and says 36 MW is expected to be available for occupancy by Q3 2027. The 60 MW value is a facility/design capacity statement; the 36 MW value is a forward occupancy target. Neither is a measured current load or a confirmed quote.
CTX2 is a separate child expansion of the existing CTX1 site. Its construction milestone, address, cooling approach, and expected delivery window are presented alongside TYPE3’s Announced/0 MW state until dated commissioning and availability evidence is accepted. CTX2 is not added to CTX1’s 100 MW operator-published IT figure or a campus aggregate.
Questions
What is Serverfarm CTX2?
CTX2 is Serverfarm’s new data-center building at 15555 Cutten Road in Houston, adjacent to the existing CTX1 campus.
How much capacity will CTX2 provide?
Serverfarm describes CTX2 as a 60 MW facility and expects 36 MW for occupancy by Q3 2027. Those are design and forward-delivery figures, not current available load.
Is CTX2 operating today?
The reviewed evidence supports structural completion and ongoing MEP/commissioning work, but it does not verify delivered customer IT load or current orderable inventory.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.