STACK Infrastructure DFW01 Campus — Plano
Overview
TYPE3’s map data identifies STACK Infrastructure DFW01 Campus, Plano as an operating wholesale/build-to-suit campus in Collin County with 80 MW. Its note describes a three-building, 45-acre campus expanding toward approximately 128 MW through a 48 MW DFW01C addition. STACK’s current DFW01 location page confirms the Plano campus, 45-acre footprint, and 80 MW of critical capacity, while listing DFW01A at 21 MW, DFW01B at 11 MW, and DFW01C at 48 MW.
The current building figures add to the reported 80 MW, but that arithmetic does not establish availability or erase TYPE3’s expansion chronology. A STACK DFW01C brochure describes a 48 MW standalone facility and build-to-suit/preleased context. Whether DFW01C is fully operational, how TYPE3’s approximately 128 MW expansion target was defined, and what power remains vacant require direct commercial confirmation.
Position the page as an operating STACK DFW01 campus with a documented building breakdown and expansion context. Keep the campus parent separate from any child tenant, suite, or building page. Ask STACK for current critical-IT load, contracted capacity, utility/substation scope, generator/UPS layer, and building-specific availability. Do not convert critical capacity or the 128 MW expansion language into a saleable block. Current leasing remains unverified, and the listed building figures do not show vacancy.
Questions
What is STACK DFW01?
STACK DFW01 is an operating three-building data-center campus in Plano on approximately 45 acres. STACK reports 80 MW of critical capacity across DFW01A, DFW01B, and DFW01C. Building-level service and availability require a quote.
How is the 80 MW divided?
STACK’s current page lists DFW01A at 21 MW, DFW01B at 11 MW, and DFW01C at 48 MW. Those figures describe reported critical capacity, not current vacant IT load, contracted capacity, or a guaranteed customer allocation.
Is STACK DFW01 expanding to 128 MW?
TYPE3’s map data describes expansion toward approximately 128 MW, while current STACK material reports 80 MW across the listed buildings. Treat 128 MW as expansion context and request current project, energization, and leasing confirmation.
Sources
Nearby facilities
Browse
Saved views, watchlists, and alerting for the live grid map are on the way. Leave your email and we'll let you know the moment member access opens.
✓ You're on the list. We'll be in touch.
This state sits outside ERCOT and outside the survey. Sponsoring one funds the work of charting it — pulling its interconnection queue, large loads, and price data onto the map.
Design mockup. No wallet, exchange account, or mailing list is connected — nothing can be sent and nothing is collected.